Arappor Iyakkam https://arappor.org People's Movement Thu, 02 Oct 2025 12:09:38 +0000 en-US hourly 1 https://arappor.org/wp-content/uploads/2023/10/cropped-Logo-Transparent-background-32x32.png Arappor Iyakkam https://arappor.org 32 32 testtemp https://arappor.org/testtemp/ https://arappor.org/testtemp/#respond Thu, 02 Oct 2025 12:09:38 +0000 https://arappor.org/?p=5527 https://arappor.org/testtemp/feed/ 0 FAQ-Protest seeking action against Adani’s Corruption https://arappor.org/faq-protest-seeking-action-against-adanis-corruption/ https://arappor.org/faq-protest-seeking-action-against-adanis-corruption/#respond Thu, 02 Jan 2025 06:44:20 +0000 https://arappor.org/?p=4946 1. What are the demands of this protest?

  • Rollback the increase in Electricity Tariff and instead recover the losses of the Electricity board from corporates like Adani that are responsible for the loss through their Corruption
  • The Central Government must immediately stop the practise of favouring Adani to make him the monopoly of ports, airports, cement business, coal import business etc
  • The Tamil Nadu state government must immediately file FIR against Adani and others on the Rs 3000 Crores Coal Import Scam in the TANGEDCO
  • The Central Government must file FIR and investigate the coal import scam of Adani throughout India across various Electricity boards
  • The Central and State Governments must Initiate investigation against Adani and others on the bribery charges raised by the US government in which Adani is being alleged to have conspired and tried bribing various Government officials of State Electricity boards to procure the Solar energy supplied by him through SECI at a higher rate.
  • The Central Government should stop the practise of misusing CBI, ED, IT, CCI and others Central Government Agencies as henchmen to handover other companies to Adani.

2. In the past, we protested against corruption by politicians, even IAS officers and govt officials, but now, why are we protesting against a private company and its owner?

We are not protesting against a private company. We are protesting to seek action from the Central and State Government for them to take action against the illegalities and Corruption done by the private  company creating huge loss to the tax payers money and increasing our Electricity Tariff. Adani’s Corruption is creating massive irreparable losses to the Electricity boards of the country.

That being said, there is also a growing need to talk about the growing monopoly of the companies and their collusion with government and bureaucracy.  We got our freedom from the British. But a little dive into history will remind us a fact that it was not the British government which captured us first. It was the “East India Company” a business unit which captured and enslaved us slowly with its monopoly in all the business of our country. Currently almost after 300 odd years we are in a similar condition where in companies of an individual named Adani is capturing all the business of our country with complete monopoly and if left unchecked will enslave us economically and will kill our democracy forever.

Already Adani has control of 13 ports and 8 airports. In addition to it, Adani has achieved monopoly in coal supply to majority of state’s Electricity boards and also in Solar energy supply. All this has happened with the active favouritism policy of the central and state Governments that needs to be questioned by us.

3. Companies growing bigger and, in this process, acquiring other companies and moving toward monopoly is a common business practise. How Adani’s monopoly is different from this and why it should be opposed and questioned ?

Monopoly in any business even if it happens through normal process is bad for the consumers and public. In fact, it is duty of the government to ensure there is no monopoly in any business and healthy competition thrives. Monopoly in essential infrastructure is detrimental to the entire nation especially when such a monopoly is achieved misusing the same government agencies whose responsibility is to ensure healthy competition and avoid monopoly.

4. How is government helping Adani to achieve monopoly?

The below cannot be dismissed as mere coincidence. There is a clear pattern that emerge to show how investigating agencies are misused to sell India and its companies to Adani!

 Case 1 : Mumbai airport

GVK Airport Developers Ltd(GVKADL) ,which is part of GVK group was holding the development and maintenance of Mumbai airport in a joint venture Mumbai International Airport Limited (MIAL) from 2006.

In July 2020, the CBI books cases on GVK group owner for allegedly causing a loss of 705 Crores to ex-chequer in the development and maintenance of Mumbai airport

In Aug 2021, Adani “acquires” GVKADL and the development and maintenance of Mumbai airport.

In Jan 2023, the CBI drops corruption charges.

Case 2 : Krishnapatnam Port, Andhra Pradesh

This Krishnapatnam Port Co. Ltd (KPCL) port, the second largest private port in India  was built by the Navayuga Engineering Company Limited, the flagship concern of the CVR Group, under a build-operate-share-transfer (BOST) agreement with the Government of Andhra Pradesh and was in operation from 2008.

Oct 2018 – The IT raids the offices of Navayuga Engineering Company Limited

Dec 2020 – Adani acquires 75% stake in KPCL port from Navayuga Engineering Company Limited, CVR group at 13% lower cost than the original deal value

Apr 2021 – Adani acquires the balance 25% stake of KPCL.

Case 3: NDTV

Jun 2017: The CBI raids NDTV and it founders in connection with loans from ICICI Bank

Dec 2022 : Adani acquires NDTV

Dec 2024 : The CBI gives clean chit to NDTV founder saying no evidence found.

There are many such cases that has unfolded right before our eyes. The Central Government and the PM Modi must be questioned heavily on this monopoly and favouritism policy for Adani.

5. What is the Rs 3000 crore coal import scam in which Adani colluded with TANGEDCO?

TANGEDCO imported 2.44 Crore metric tons of coal between 2012 to 2016 for use in its thermal power plants. Tender conditions were made restrictive to favour Adani and few others and Adani alone supplied 50% of the coal, close to 1.19 Crore Metric tons.

As per the tender conditions, Adani has to supply 6000 kcal/ kg quality to TANGEDCO which will be used by various thermal plants under TANGEDCO. As per the CAG report and evidences gathered by us, Adani fraudulently supplied sub-standard coal of 3500kcal/kg instead of 6000kcal/kg, that too at a highly inflated price than the market rate, causing a loss of around Rs.3000 Crore to TANGEDCO. The State Government instead of recovering this huge loss from Adani and blacklisting them in TANGEDCO, passed on the loss to the consumers in TN through hiking of Electricity Tariff. Why should common citizen pay for the Corruption of Adani? The State Government and the CM Stalin that came to power promising FIR on this scam must be questioned for this blatant surrender to Adani!

6. What are the evidences available proving the coal scam in TANGEDCO ?

    There are several crucial evidences in the scam

  • Evidences obtained through RTI on big price differences (of USD 20 per metric tonne) between TANGEDCO and TNPL for the same quality of coal
  • CAG report showing low grade coal fraudulently reported as high grade coal
  • Proof of shipment showing that the coal loaded and sent from Indonesia is of 3500 Kcal/ Kg whereas proof of how the same shipment is claimed as 6000 Kcal/ kg by Adani to TANGEDCO.
  • Comparison with Indonesian market prices of coal showing over-invoicing.

For Example: Adani buys coal from a Company called PT Johnlin Group in Indonesia. Even by the website details of PT Johnlin , the highest quality of coal supplied by this company is 5200 KCal.

     1) For the consignment in a ship “MV Kalliopi”, a certificate of origin was issued for 69925 MT of Coal from PT Johnlin Indonesia to TANGEDCO Chennai India.

     2) For the same ship consignment ,”PT Johnlin” raises an invoice for $28/MT to “Supreme Union Investors Ltd” a middleman company in British Virgin islands, a tax haven.

    3) For the same ship consignment , “Supreme Union Investors Ltd” raises an invoice of $33.74/MT to “Adani Global” and mentions the quality of coal as 3500Kcal/kg.

    4) For the same ship consignment , Adani raises an invoice of $91.91/MT to TANGEDCO and mentions the quality of coal as 6000Kcal/kg.

For a single shipment Adani has inflated the prices by 91-28 = 63$ which is a direct loss to TANGEDCO and in turn to the exchequer.

For the 1.2 Crore metric ton of coal, the total loss amounts to much more than Rs 3000 Crores. Apart from this direct loss of money, it is important to note that this price is inflated for the coal of standard 3500Kcal/ Kg instead of the expected 6000Kcal/Kg by TANGEDCO.

7. How does low quality coal affect our Electricity Tariff?

1 Kg of 6000 Kcal coal can generate 2.1 units of electricity while 1 kg of 3500 Kcal coal can only generate 1.2 units of electricity. Therefore, when Adani alone supplies1190 crore Kg of coal to TANGEDCO, the loss in units due to low grade coal is (2.1-.12)*1190 crores of units = 1071 Crore units of Electricity. Government has to now spend extra Rs.3000 to 4000 Crores to generate this amount of Electricity (assuming a rate of Rs.3 to Rs.4 per unit). Such corruption is the reason for losses in TANGEDCO. This loss is directly placed on the consumers through Tariff increase.

8. Was there a Coal shortage in TANGEDCO in addition to the money loss due to the scam?

Yes definitely. There was news around Aug 2021, where the TNEB minister  Mr. Senthil Balaji at that time declared that 2.38 Lakh tonnes of Coal worth Rs.85 Crores was missing from TANGEDCO’s North Chennai power plant and hinting about similar issues in the Mettur and Tuticorin thermal stations. The Coal was not missing, but it is just basic science that when you have procured 3500Kcal/kg Coal in place of 6000 Kcal/kg coal, you will be forced to burn more coal to generate same power and you will run out of coal earlier than planned. It is learnt that this apparent over burning was not entered into stocks showing as though the coal is still available in stocks. Even though the State Government and its Minister said that strict action will be taken on the coal disappearing, it is now found that the report about the coal disappearing has itself disappeared!

9. Was there no quality check from TANGEDCO side to ensure the grade of coal procured?

The Quality check was designed exactly to facilitate the corruption. In the tender conditions itself  TANGEDCO had come up with a weird quality checking process  in which a Third party appointed by Adani himself will test and provide a quality report and also will provide the sample for testing to TANGEDCO. By this weird quality checking condition, they have ensured that low grade coal can be imported in place of high grade coal fraudulently on one side and on other side Adani can ensure providing high grade coal for sample testing alone. The Quality check has happened both at the place of export (Indonesia) and import(India) and both the quality checks were done by the same company  GeoChem appointed and paid by Adani. Geochem is already well known for fake quality certificates.

10. Was there any FIR earlier on anyone involving such supply of low grade coal ?

Yes. Similar corruption and scam worth Rs.500 Crore was allegedly done by Coastal Energy Private Limited, which supplied inferior quality of coal imported from Indonesia to NTPC and Arvali Power Corporation causing a loss of Rs.500 Crore. CBI in 2018 had filed an FIR in this case against Ahmed A R Buhari, the promoter of Coastal Energy Private Ltd and Ahmed A R Buhari was jailed in this case.

But Adani doing the same scam and corruption mounting to Rs.3000 Crore in TN alone and to Several Thousand crores of rupees across various State Electricity Boards is roaming free. It’s an irony that now Adani has taken over this Coastal Energy Private Limited, another classic example how Union government agencies help Adani acquire competing companies.

11. Was recent indictment in the US Court against Adani related to the Coal scam above?

No, it is a completely new scam involving Electricity Board of various states of India.

12. Can you explain more on this new scam and the related indictment by the US government on Adani?

It was a detailed 54 page indictment filed in the United States district court, Eastern district of New York with details and proof submitted by various USA government agencies like FBI,SEC.

In short, as per the indictment document by the US, Gautam S Adani, Sagar Adani, nephew of Gautam Adani and Vineet S Jain of Adani Green Energy  colluded and conspired with few other corporate officials from Azure Power and Canadian investor company CDPQ to bribe various Indian government officials to persuade them to buy power from Solar Energy Corporation of India( SECI), a Government of India enterprise to whom Adani supplies their Solar power.

13. Why should Adani bribe state government officials to buy power from SECI, a Union government enterprise?

Around June 2020, Adani Green Energy won the tender by SECI to supply 8GW  of Solar Power to SECI at the rate of Rs.2.92 per kWh for next 25 years. Azure Power, the second winner of this tender was to supply 4 GW of Solar power to SECI at the same rate of Rs 2.92 per kWh for next 25 years.  SECI in turn would sell this solar power procured from Adani and Azure power to Electricity Board of various state governments. This tender was called as “Manufacturing Linked Project“. Adani  and Azure power announced this as winning the world’s largest manufacturing-linked solar tender.

Both Adani Green energy and Azure power were planning to raise investment worth  several billion dollars in USA based on this project win and the profit projection out of this project for the next 25 years.         But SECI could not find any buyers from any of the State government’s electricity board due to higher tariff. With no buyer for SECI, SECI could not buy from Adani Green Energy and Azure power and the project stalled.

In order to make this project work with higher profit margin for the next 25 years as already calculated and to raise investment in US for the same, Electricity Boards of state government had to make agreement with SECI to buy solar power from SECI.

For the Electricity Boards of the state governments to buy Solar power from SECI at a higher tariff, Adani and other Corporate officials promised bribes to the officials of the Electricity boards. The Electricity boards mentioned in the indictment include the states of Andhra Pradesh, Tamil Nadu, Orissa, Chhattisgarh and Jammu and Kashmir.

14. Who are all the Indian Government officials that were offered bribe and how much?

As per the indictment document by US, Adani promised bribe to officials of the Electricity boards of Odisha, Jammu and Kashmir, Chhattisgarh, Andhra Pradesh and Tamil Nadu on various occasions between July 2021 and February 2022.

The total amount of bribe promised is approximately Rs.2029 Crores, out of which around Rs.1750 Crores were offered to an official in Andhra Pradesh alone. By this magnitude of bribe we can assume how much profit and investment projection would have been involved in this project.

15. What is our demand in this scam?

The US has filed an indictment because their investors are affected when bribe is paid. On the other side, we very well know that the people who will be most affected by such offer of bribe are Indian consumers as eventually such bribery amounts will be passed on to consumers who will be forced to pay more tariff. Therefore, both the Central and the State Government should file an FIR and investigate the scam and the bribery schemes.

16. Are there any other proofs submitted by the US government agencies regarding the bribe scheme?

The US government agencies have recovered documents from the cell phone of Sagar R Adani named “Bribe Notes”. This Bribe Notes identified

  1. i) the state and the region in which the government officials had been offered a bribe
  2. ii) the total amount of the offered bribe

iii) the approximate amount of solar power the state or region would agree to purchase in exchange for the bribe.

In most instances the bribe notes also identified the per megawatt rate for the total bribe amount offered, the abbreviated titles of the government officials who would receive the bribes, and/or the allocation of the total bribe amount among government officials within each state and region.

Apart from these, Vineet S Jain had a photograph of a document in his cell phone summarising the share of bribe amount Azure power owed to Adani. As per the documents, Azure power share in the bribe amount was Rs.638 Crores (of the total 2029 Crores].

There were various PowerPoint and excel documents which showed how they were analysing various options through which Azure power can pay its bribe share of Rs.638 crores to Adani. It is to be noted that Azure power returned its share of 2.3 GW of power supply agreement back to SECI and SECI awarded this 2.3GW power supply agreement to Adani as a mode of pending bribe payment of Azure to Adani. Thus Azure Power paid back its part of share of bribe by giving part of the project won by them to Adani.

17. What is the expected action from the Indian Union government and TN state government ?

The Union Government should cancel the current Power Purchase Agreement(PPA) that the SECI has with Adani immediately and the CBI should file an FIR on Adani and various government officials involved and investigate the scam in detail.

There has been accusation in indictment that the Government officials from Tamil Nadu have also been offered bribe and that the TANGEDCO has agreed to buy power from SECI. So legally DVAC under TN Government can file an FIR against Adani and unknown TN Government officials involved and start investigation on the bribery charges.

18. Is the recent visit by Adani to TN and speculation around it related to this bribery scheme?

It may not be so since the meeting to offer bribe and the related deal happened between July 2021 and Feb 2022. But we have reasons to believe it may be related to the coal scam. Arappor Iyakkam has been demanding FIR on Adani on the Coal scam in TANGEDCO from 2018 after its official complaint to DVAC. Since there was no action till 2024, even 3 years after DMK government took charge, around last week of  June 2024, Arappor Iyakkam requested permission to protest in the Assembly requesting FIR on Coal scam done by Adani between 2012 and 2016.

Soon after this on 02 July 2024, news about TN Government’s approval to DVAC to start preliminary investigation came out. Following this, Adani visited Chennai on 09th July 2024 . With the Government hiding the data on details of which Government officials Adani had visited during this time, we have a strong suspicion that Adani might have visited Chennai to try to stop the TN government from filing an FIR against him in the Rs 3000 Crore Coal import scam.

19. Both the Union government and TN State government are not ready to take action on Adani. What can the public do ?

Scams like these will end up in increased Tariffs for the common man . So it is important for the public to voice against these kind of collusion and conspiracy between the businessmen and the politicians and demand proper legal action. This is the precise reason why we are organising a protest against this collusion on 05-Jan-2025 at 9.30 Am at Valluvar Kottam. When more people raise their voice, the Government of the day will be forced to disassociate from any underhand dealings with Adani and increase the chance of taking legal action against Adani’s scams.

20. Will anything change if the public protest?

We, the people, need to use all the democratic means available to us to make the Corrupt accountable. Protesting on one day and leaving the issue as such won’t help. But we have collected evidence of Corruption against Adani, complained about the scam with evidence and have applied continuous pressure to come to a position of starting an enquiry against him in Tamil Nadu. We have also continuously created awareness amongst the masses about the scams.

All these will add pressure on the Government. Even a Government which wants to broker a deal with Adani will have to think twice if there is people’s wish and pressure against it. Only a few committed people have always ended up changing the status quo and it is therefore our duty to use all democratic means and ways to change the status quo. One such powerful way of expressing people’s wish and want is through people’s gathering. Right to assembly and right to free speech are fundamental rights given to us, the citizens.

Let us use it responsibly in demanding FIR and investigation on Adani; let us demand stopping of Adani’s monopoly; let us demand our EB Tariff to be decreased; let us demand that the recovery be made from the Corrupt such as Adani.

Come on January 5 to Valluvar Kottam at 9.30 Am. Together we can make a difference!



Register for the Protest


Join Whatsapp Group

]]>
https://arappor.org/faq-protest-seeking-action-against-adanis-corruption/feed/ 0
Electricity Tariff Comparison Report https://arappor.org/tn-electricity-tariff-comparison-report/ https://arappor.org/tn-electricity-tariff-comparison-report/#respond Fri, 27 Dec 2024 09:30:18 +0000 https://arappor.org/?p=4902 தமிழ்நாடு மின்கட்டணம் தொடர்பாக DIPR வெளியிட்ட பொய் செய்திக்கு அறப்போர் இயக்கத்தின் அறிக்கை வெளியீடு


Click here to Download Report

டிசம்பர் 16, 2024 அன்று தமிழ்நாடு அரசின் அதிகாரப்பூரவ செய்தி தொடர்பு துறை தமிழ்நாடு மின் கட்டணம் குறித்த ஒரு அப்பட்டமான பொய் செய்தியை வெளியிட்டது. இந்தியாவிலேயே தமிழ்நாட்டில் தான் வீட்டுக்கு விநியோகம் செய்யும் மின்சார கட்டினம் குறைவாக உள்ளதாக DIPR வெளியிட்ட செய்தி உண்மைக்கு புறம்பானது என்பதும் ஒரு முழு பூசணிக்காயை மறைக்க தமிழ்நாடு அரசு எடுத்த அப்பட்டமான முயற்சி இது என்பதையும் தெரிவித்து கொள்கிறோம். அந்த செய்தி உடனடியாக பல ஊடகங்களிலும் செய்திதாள்களிலும் இந்தியாவிலே தமிழ்நாட்டில் தான் குறைந்த மின்கட்டணம் போல செய்தி வெளியிடப்பட்டது.

இதற்கு பதில் அளிக்கும் விதமாக அறப்போர் இயக்கம் மின்சார கட்டணத்தில் ஒவ்வொரு பிரிவிலும் தமிழ்நாடு எந்த இடத்தில் இருக்கிறது என்பதற்கான விரிவான ஆய்வறிக்கையை இத்துடன்  வெளியிடுகிறோம்.

DIPR தன் செய்தி வெளியீட்டில் இது திமுகவோ அரசோ சொல்லவில்லை என்றும் அரவிந்த் வாரியார் என்னும் ஆய்வாளர் சொன்னதாகவும் தெரிவித்து இருந்தனர். அரவிந்த் வாரியார் என்பவர் X தளத்தில் கிட்டத்தட்ட 4000 பேர் பின்பற்றும் கேரளாவை சேர்ந்த ஆசிரியர் என்பதும் இது போல அரசு தகவல்களை தொகுத்து அவர் பக்கத்தில் போடுவதும் தெரிந்தது. அதில் அவர் 100 யூனிட் வரை பயன்படுத்தும் வீட்டு விநியோகம் மின் கட்டணம் தொடர்பாக மட்டுமே தமிழ்நாடு குறைவான கட்டணம் என்பதை தெரிவித்து இருந்தார். ஆனால் அதை திரித்து இந்தியாவிலேயே வீட்டு விநியோக மின் கட்டணங்களில் தமிழ்நாடு தான் குறைந்தது என்று DIPR வெளியிட்டுள்ளார்கள்.

வீட்டு விநியோக மின்சாரத்தை பொறுத்தவரை மாதம் 100 யூனிட் வரை பயன்படுத்தும் பிரிவில் மட்டுமே தமிழ்நாடு முதல் இடத்தில் உள்ளது. மற்ற எந்த பிரிவிலும் தமிழ்நாடு முதல் இடத்தில் இல்லை. மாறாக மாதம்  800, 1000 யூனிட் பயன்படுத்தும் பிரிவுகளில் மிக அதிக கட்டினம் வசூலிக்கும் மாநிலங்களில் ஒன்றாக தமிழ்நாடு இருக்கிறது. இந்த பிரிவுகளில் நம்மைவிட கிட்டத்தட்ட 29 மாநிலங்களில் மின்கட்டணம் குறைவாக உள்ளது.

மேலும் 100 யூனிட் தவிர அனைத்து பிரிவுகளிலும் மின் கட்டண தரவரிசையில் தமிழ்நாடு சரிந்து வருகிறது. மாதம் 200 யூனிட் பயன்படுத்துபவர்கள் மின்கட்டணத்தில் 2019-20இல் 4வது இடத்தில் இருந்த தமிழ்நாடு 2023 இல் 9 வது இடத்திற்கு சரிந்தது. முதல் ரேங்க் என்பது குறைவான மின் கட்டணம். மின் கட்டணம் ஏற ஏற நாம் மற்ற மாநிலங்களை விட தரவரிசையில் கீழே சென்று கொண்டு உள்ளோம்.

மாதம் 400 யூனிட் பயன்படுத்துபவர்கள் மின்கட்டணத்தில் 2019-20இல் 12வது இடத்தில் இருந்த தமிழ்நாடு 2023 இல் 18 வது இடத்திற்கு சரிந்தது. தமிழ்நாட்டில் இந்த பிரிவில் உள்ளவர்கள் யூனிட்டுக்கு ரூ 5.69 கட்டுகிறார்கள்.

மாதம் 600 யூனிட் பயன்படுத்துபவர்கள் மின்கட்டணத்தில் 2019-20இல் 14வது இடத்தில் இருந்த தமிழ்நாடு 2023 இல் 24 வது இடத்திற்கு சரிந்தது. தமிழ்நாட்டில் இந்த பிரிவில் உள்ளவர்கள் யூனிட்டுக்கு ரூ 7.29 கட்டுகிறார்கள்.

மாதம் 800 யூனிட் பயன்படுத்துபவர்கள் மின்கட்டணத்தில் 2019-20இல் 15வது இடத்தில் இருந்த தமிழ்நாடு 2023 இல் 29வது இடத்திற்கு சரிந்தது. தமிழ்நாட்டில் இந்த பிரிவில் உள்ளவர்கள் யூனிட்டுக்கு ரூ 8.22 கட்டுகிறார்கள்.

மாதம் 1000 யூனிட் பயன்படுத்துபவர்கள் மின்கட்டணத்தில் 2019-20இல் 16வது இடத்தில் இருந்த தமிழ்நாடு 2023 இல் 30 வது இடத்திற்கு சரிந்தது. தமிழ்நாட்டில் இந்த பிரிவில் உள்ளவர்கள் யூனிட்டுக்கு ரூ 8.78 கட்டுகிறார்கள்.

உண்மை இப்படி இருக்க தமிழ்நாட்டின் செய்தி தொடர்பு துறை தமிழ்நாட்டில் 1௦௦ யூனிட்டுக்கு மேல் பயன்படுத்துபவர்கள் சராசரியாக ரூ 113 ருபாய் தான் மின் கட்டணமாக செலுத்துகிறார்கள் என்று ஒரு மிகப்பெரிய பொய்யை சொல்லி உள்ளது.

மேலும் நமது ஆய்வறிக்கையில் மற்ற பிரிவுகளான கமெர்ஷியல், சிறு, நடு மற்றும் பெரிய தொழில் நிறுவனங்கள் பிரிவுகள், விவசாயம் போன்றவற்றையும் ஆய்வு செய்துள்ளோம்.

அனைத்து கமெர்ஷியல் பிரிவுகளிலும் தமிழ்நாடு இந்தியாவிலேயே மிக அதிக கட்டணம் வசூல் செய்யும் மாநிலங்களில் ஒன்றாக உள்ளது. முக்கியமாக பெட்டிக்கடை போல மாதத்திற்கு வெறும் 300 யூனிட் பயன்படுத்தக்கூடிய பிரிவில் தமிழ்நாடு இந்தியாவிலியே மிக அதிகமான கட்டணத்தை வசூல் செய்யும் மாநிலமாக உள்ளது. தரவரிசையில் 37வது அதாவது கடைசி மாநிலமாக தமிழ்நாடு உள்ளது. இதே போல மற்ற கமெர்ஷியல் பிரிவுகளிலும் அதாவது மாதத்திற்கு 750, 1500, 3000, 4500, 6000, 7500 யூனிட் பயன்படுத்தும் பிரிவுகளிலும் தமிழ்நாடு மிக அதிக கட்டணம் வசூலிக்கும் மாநிலமாக உள்ளது. தரவரிசையில் 30 முதல் 37வது இடத்தில் தான் உள்ளோம். கடந்த ஆட்சியை விட இந்த ஆட்சியில் தரவரிசையில் தமிழ்நாடு சரிந்து கொண்டே போவதை கீழே காணலாம்.

இதே போல நடுத்தர தொழில் நிறுவனங்கள் (medium industries) பிரிவுகளிலும் தமிழ்நாடு அதிக மின் கட்டணம் வசூல் செய்யும் மாநிலமாக உள்ளது. இந்த பிரிவிலும் தமிழ்நாடு வேகமாக சரிந்து 27 மற்றும் 30 வது இடங்களில் உள்ளது.

விவசாய மின் இணைப்பு பிரிவுகளில் தமிழ்நாடு, கர்நாடகா மற்றும் பாண்டிச்சேரி மாநிலங்களில் எந்த மின்கட்டணமும் இல்லை. இந்த பிரிவுகளில் தமிழ்நாடு முதல் இடத்தில் உள்ளது.

பெரு நிறுவனங்கள் பிரிவுகளிலும் தரைவரிசையில் 19 முதல் 25 வது இடத்தில் தமிழ்நாடு உள்ளது. மேலும் விரிவான தகவல்களுக்கு இத்துடன் சேர்த்து இணைத்துள்ள அறப்போரின் ஆய்வறிக்கையை பார்க்கவும்.

இப்படி ஓரிரு பிரிவுகள் தவிர மற்ற அனைத்து பிரிவுகளிலும் தமிழ்நாடு அரசின் மின் கட்டணம் நாட்டிலேயே மிக அதிகமாக வசூல் செய்யும் மாநிலங்களில் ஒன்றாக இருந்தும் தமிழ்நாடு தான் இந்தியாவிலேயே வீடு விநியோக மின்கட்டணத்தில் குறைவானது என்று உண்மைக்கு புறம்பாக DIPR  பத்திரிகை செய்தி வெளியிட்டது வன்மையாக கண்டிக்கத்தக்கது. ஏற்கனவே மின் கட்டணத்தால் அவதி படும் மக்களின் வெந்த புண்களில் வேலை பாயக்கும் செயல் ஆகும். மேலும் இந்த ஆய்வு 2023 வரையில் தான். இந்த வருடம் மீண்டும் மின்கட்டணம் உயர்வு ஏற்றப்பட்டுள்ளது குறிப்பிடத்தக்கது. இதனால் தமிழ்நாட்டு மக்களுக்கு மேலும் பாதிப்பு ஏற்பட்டுள்ளது.

தமிழ்நாடு அரசு நிலக்கரி இறக்குமதி போன்ற ஊழலால் இழந்த பணத்தை அதானி போன்ற ஊழல்வாதிகளிடம் இருந்து மீட்க வேண்டும். தமிழ்நாடு அரசின் நிர்வாக திறமையின்மையாலும் ஊழலுக்கு ஆதரவான நிலைப்பாட்டில் திமுக அரசு உள்ளதாலும் ஊழலால் இழந்த பணத்தை ஊழல்வாதிகள் இடமிருந்து மீட்காமல் மக்கள் தலையில் மின்கட்டனமாக வைக்கிறார்கள். இதை கண்டித்து அறப்போர் இயக்கம் வருகிற ஜனவரி 5 காலை 9.30 மணிக்கு வள்ளுவர் கோட்டத்தில் ஆர்ப்பாட்டம் செய்ய உள்ளோம். தமிழ்நாடு அரசு உடனடியாக மின் கட்டணத்தை குறைக்க வேண்டும்.

– அறப்போர் இயக்கம்


Click here to Download Report

]]>
https://arappor.org/tn-electricity-tariff-comparison-report/feed/ 0
Citizen led Study in TNUHDB Buildings https://arappor.org/citizen-led-study-in-tnuhdb-buildings/ https://arappor.org/citizen-led-study-in-tnuhdb-buildings/#respond Mon, 25 Nov 2024 14:18:09 +0000 https://arappor.org/?p=4798 Citizen-led Study in TamilNadu Urban Habitat
Development Board Buildings.

An initiative of Arappor Iyakkam

Introduction:

Arappor Iyakkam is an organization working towards Transparency and Accountability in Governance. We write this representation regarding the issues faced by residents of Tamil Nadu Urban Habitat Development Board who have been relocated from various parts of Chennai to buildings constructed by Tamil Nadu Urban Habitat Development Board (TNUHDB). These people face several issues due to the poor infrastructure in place. This requires immediate attention by the Government.

Arappor Iyakkam’s volunteers visited TNUHDB buildings in Perumbakkam, Semmenchery, Kannagi Nagar, Navalur, Thiruvottiyur, KP Park and Thideer Nagar in the month of August and September 2024. Thideer Nagar is an area where citizens have been demanding construction of TNUHDB building.

The study is intended to bring out the various issues faced by residents of TNUHDB and is also an effort to involve citizens from across Chennai to understand the issues of people living in TNUHDB and make continuous efforts to solve them. More than 50 volunteers participated in this study. The study is a documentation of the issues reported by the volunteers based on their interaction with the residents directly in the field.

The study has brought out various lapses from basic amenities such as lack of water, sewage issues, lift and power cut issues, garbage issues etc. The study also brings out the common problems of poor quality of construction of these buildings and the poor maintenance by TNUHDB department. Issues of drug amongst youth and lack of livelihood has further complicated the lives for the residents. The Government needs to take serious note of the study and work towards ensuring their basic needs and requirements.

Issues faced by residents of TNUHDB:

1. Kannagi Nagar and Ezhil Nagar:

Kannagi Nagar, Ezhil Nagar and Ezhil Nagar Tsunami Quarters come under ward 195 and 196 of Chennai Corporations.

  • Quality of construction of houses – restored building

Poor quality of construction of houses is the biggest problem people are facing in all types of houses at Kannagi Nagar and Ezhil Nagar. Patches on the walls are coming out both on the Interior and exterior walls. Rainwater coming through the ceiling, fans is a common problem for the people living on the top floors. Due to poor functioning of drainage, sewage water coming into the houses during rains is again a common problem of houses in the ground floor. Some people have deserted their houses and moved out to other houses as the patch work or drainage issue was unattended by the officials. Some houses were restored by the TNUHDB 2 to 3 years back as they were in a very bad shape but the restoration work did not help and hence many houses are still in very bad shape.

     

  • Absence of options for Livelihoods

Residents reported that they are suffering very badly without any job for their livelihood. They said that many men and women are willing to go for work but there is no work available for them due to various reasons.

  • Transportation

Since the relocated places are faraway and there are thousands of people who have to commute to city for work, bus facility is not adequate. They also spend a lot for commutation in spite of the free bus facility available for women.

  • Common Infrastructure – samudhaya nala koodam, ICDS

There is a big pit dug to build a samudhaya koodam but the drainage line is going through the said construction place and the project is left unattended now. Because of the big pit, drainage and rainwater has stagnated and become a house for mosquito breeding. And the people are denied the opportunity of using the facility since it is not constructed.

There are about 16-18 Anganwadi centres run inside the tenements in the TNUHDB houses itself whose quality remains a concern. There are around 4 exclusive centres of Anganwadi but residents say that more such exclusive centres are needed to address the early education and malnutrition of children instead of running them in small households.

  • Functioning of Urban Primary Health Centre (UPHC) and Urban Community Health Centre (UCHC)

UPHC (near market bus stopping Kannagi nagar – Centre timing is from 8 am – 4 pm but it is closed at 12 noon itself. People are finding it difficult to avail the health care in the evenings and on Sundays.

UCHC (near bus depot) – working time is 24 hours but it is not working for 24 hours. The in-patient ward is closed and used as a storehouse. Residents inform that unavailability of specialised doctors such as paediatrician and gynaecologist and lack of sufficient medicines are important concerns.

Wellness Centre – Fully constructed Wellness Centre in Ward 196 is yet to be inaugurated inspite of completing construction months ago.

  • Compound walls (infront of canals – okkiyam maduvu)

Houses in Ezhil Nagar are located on the canal banks and there is no compound wall between the canal banks and the housing tenements. Hence, there are lots of snakes in the residential area and there were some deaths due to snake bite. Because of the nearby canal with mixed sewage water, people are suffering badly with mosquito menace.

  • Missing Roads

Roads in Ezhil nagar were not re-laid for many years. No road was laid at all near I Block at Ezhil Nagar.

  • Haphazard EB connections

There are multiple issues with EB for the people living in these areas. EB cables are laid openly on the walls in the staircases. There is absolutely no safety to the people. People are exposed to danger every time while using the staircase. Children are playing up and down by passing through these EB cables.

There are also EB cables laid on the floor in many places including water pumps. DB boards, wood panels of EB metre boxes are to be replaced in many places as they are hanging and it is dangerous. Earth cables are found missing in the EB lines which is very dangerous to the safety of people.

An EB metre for tenements for one particular block is situated in some other block. This is the case for many tenements particularly for tenements in Block 6 and 14. There is no reading of EB metres by the EB staff. Billing method is to be streamlined to help the people paying unnecessary and unreasonable charges. EB staff treat the people very rudely when people contact the EB to check for the status of power-cut and other issues.

  • Quality, Availability of Water

Quality of water is yellow. After giving many representations and complaints, the solution people found by themselves is to leave the water going waste (flowing on the floor and stagnating) for 30 minutes and then start using for themselves. Water is distributed through ‘Keezhnilai thotti’ (UG SUMP) by the TNUHDB though it is filled by Metro water. There are 6 Keezhnilai thotti in total viz., 4 in Kannagi Nagar, 1 in Ezhil Nagar and 1 in Ezhil Nagar Tsunami Quarters. These ‘Keezhnilai thotti’ are kept open in many places and hence there is garbage collected inside these drinking water SUMPs. And during the rains, these tanks are mixed up with sewage water and hence drinking water gets mixed up with sewage water.

Distribution of drinking water is not uniform. Some areas get water every alternate day and some areas get water once every 2 to 3 days. Mixing of chlorine is not automated and it is done by the employees and hence the same is not done uniformly. Sometimes, there won’t be enough chlorine and sometimes too much of chlorine mixed.

There is no 24 hours source of water in any part of these areas. If people have any emergency, like a death in a family, etc they don’t have a provision to take water even from one common place. Hence each area should be given a source of water 24/7 where people can go and collect water.

  • Storm Water Drain

Storm water drains are under construction in some areas. The existing ones should have proper connections with an outlet to avoid flooding during the rain. In many places the chambers are kept open which is dangerous, especially for children and in some places. Mixing of sewage water in SWD lines and absence of desilting the SWD lines defeat the purpose of SWD. Ongoing SWD work should be given utmost priority by the officials to monitor SWD work not to add misery to people in the name of providing a facility.

  • Sewage

Because of the poor quality of the sewage connection, sewage water is overflowing into some ground floor houses making it unlivable. Small cement pipes used for sewage drainage lines, blockage etc are the cause for drainage overflow. Sewage drain chambers are found without any cover hence garbage and rats are seen in the sewage lines. A house in Block 11 was full of sewage water for about 8 inches all over the house as the drainage connection at the backside of their house is not rectified. Hence the owners have vacated the house but the rest of the residents in that block are suffering with bad smell and mosquitos. There is a small drainage line created by the people inside the block to send out the drainage water flowing from the house. Everyone walks through that line inside the premises. It is extreme hardship for people living in Blocks 9, 11, 16, 23,24, 37 and 42.

  • Garbage collection

There is no effective solid waste management schemes. And there is no separate bins for wet and dry waste. Only one bin is kept near every block. Urbaser staff empty the bins kept near each block and dispose of them through trolleys. The bins are not cleaned periodically and placed properly in one particular place.

  • Public toilets

There is no public toilet available in the entire Kannagi nagar and Ezhil nagar (Ward 195 & 196). There is one public toilet built in ward 196 but is locked.

  • Burial ground

Even death is a costly affair for the people living in these Tenements. There are exclusive burial grounds for Hindu, Christian and Muslim people. Residents reported that there is a person deputed as in-charge for burial / cremation work but without any salary. Therefore, residents say that this person gets his payment from the family of the deceased which costs around Rs.5,000/to Rs.10,000/- for a family. This is a huge burden for the families.

2. TNUHDB KP Park Housing Phase 1 & 2:

  • Lift issue

In K P Park out of 4 lifts installed in Blocks A, B, C, D and F only 2 lifts (L2 & L4) alone is in working condition. When we checked with Lift operator and the residents the lifts are not working for the past 4 months.

On June 29, 2024 in Block D a resident by name Mr.Ganesan lost his life while trying to get out of the stranded lift due to power failure. The lift was going down from 10 floor and stranded between 8th and 7th floor. The safety mechanism which helps to reach down the next floor (in case of power failure) with the support of battery was not installed / faulty.

So far no solatium was given to the victim’s family by the government and no action has been taken against the Engineer and the lift maintenance contractor responsible for the death who did not ensure battery and Genset power connection. Infact, it is reliably learnt that TNUHDB has not even initiated disciplinary proceedings against the concerned Engineers.

  • Garbage

There is a maintenance office building located to the left of the entrance way to the premises. It is much obvious that there was no cleanliness all around the buildings and open areas. There is a lot of trash seen around the building which are not cleared.

Sewage and Common Toilets Condition

As could be seen from the picture, the toilets are poorly maintained. The doors are in poor shape

Poor quality construction and lack of maintenance

As well known, this building’s plastering was done very poorly with 90% of the plastering failing in the study done by IIT CUBE report. Yet there has been no accountability on this issue. Neither there has been any steps to improve the plastering.

Safety Concerns

Entire Stairway wall openings are not protected properly with closely fixed guardrails. As seen in the picture it was simply fixed with steel pipes having easy opening for any children to get into it. Just a namesake guardrail fixed without functioning its purpose.

Fire water hoses seen on the back sides of the building. It looks to be namesake installation. Residents are expressing their concern that they were not explained or trained on its usage in case of emergency.

Also there seems CCTV cameras around but people are complaining those are not working.

3. Perumbakkam TNUHDB

Perumbakkam TNUHDB comes under Perumbakkam Panchayat, Chengalpattu District

Lack of running water

People get water in their pipeline for 1 hour every 2 days. Within this 1 hour they have to ensure that they fill in their buckets for use for the next 2 days. It is pathetic that running water could not be provided to people.

The quality of the water, maintenance of the sump, valves etc are an area of key concern as well.

Frequent Power Cut and Lift issues

Residents near block 63, 64 etc reported that there is regular power cut which is multiple times a day. This results in non-usage of lift. Power cut and voltage fluctuations remain a key problem and multiple complaints by the residents have not solved the problems.

Open EB cables

EB cables are just laid on the floor passing through the houses. Any damage to the cable will be a big threat to the lives of people. After we published a video, there were some efforts to make this situation slightly better.

Sewage entering houses

There is no proper drainage connection in Perumbakkam. Sewage has been entering houses regularly in Blocks 63, 64 etc in the ground floor and they have to keep complaining about it continuously without much hope. After our initial videos, the leakage of sewage on the main road has been addressed to some extent. Residents demand a permanent solution to this and prevent sewage from entering houses.

Poor Construction of Buildings

The building construction in Perumbakkam is extremely poor. It visually looks like that these constructions have been made with 10 to 15 bags of sand per bag of cement. People in block 63 and 64 explained to us how the ceiling plastering is falling on them and how they have to live within the houses within touching the walls as the plastering peels off.

Bus facility

There are close to 50000 people in the area. However, residents complain that there is no sufficient bus service. Many people go for corporation sanitation work as early as 4 am in the morning. But the buses are very crowded.

Street Light

Street lights are not sufficient and it is pitch dark after 7 pm in the evening on the main roads towards the bus stand. Women feel high;y unsafe to travel.

Drug Issue

Drug culture is a big issue in Perumbakkam. Children are getting addicted at very young age. Hence going to school and work is a challenge. This also leads to various other social problems like child marriage, giving birth to children at a very young age, lack of women safety and so on.

4. Semmanchery TNUHDB

Semmanchery comes under ward 200 of Chennai Corporations

Open EB cables

EB cables are just laid on the floor passing through the houses. Any damage to the cable will be a big threat to the lives of people.

Open Drainage in 8th Main Road

There is no proper drainage connection in Semmanchery. The enclosed photo shows the situation in 8th Main road of Semmanchery where the sewage water is let out on the land which gets mixed in the drinking water sump and SWD during the rain.

The Poor state of Public Park

There is a public park earmarked in the 69th cross street, Semmanchery but the park is in abandoned state and filled with waste debris. There is no proper compound wall and the park is used by the anti-social elements.

Floods

Like many other resettlements, Semmanchery is also said to be on a water body. Hence the area is prone to flooding and water inundation. The sufferings and the loss faced by the people in Semmanchery during and after the floods is very high. After every rain, the whole resettlement area will be inundated by rain water for many days. Therefore the electricity is disconnected till the water drains through the roads. For every heavy rain, there won’t be electricity for almost a week. The people who are living in the ground floor will go to the first floor house and both the house people adjust among themselves within the 150 sq.ft house till the water drains in the ground floor. Apart from their sufferings, the people also incur huge loss as their belongings like house hold items, beds, etc get drained in the rain water.

Leakages in the buildings

Maintenance of buildings is not done in many blocks. Hence leakage of water inside the houses through the ceiling is also a major issue for the people during the rain times.

PHC

There is a Primary Health Centre available for the entire area. But people said that the doctor will be available from 7 am to 10 am only and nurses only attend the patients and give medicines after that.

Water Scarcity for 2nd Avenue, Semmanchery

There is no uniform distribution of water due to irregular flow of water lines. People live in the second avenue hardly get the metro water. Once in a week or once in 10 days only they get water. Rest of the days they buy water for Rs.2 per pot. Each house spends Rs.200 for water apart from drinking purpose in this particular area. Rest of the areas in Semmanchery are getting water for 2-3 hours every day.

No burial ground for Christians

Residents said that there is no burial ground provided for Christians in this area. There are more than 500 Christian families that live in Semmanchery.

Attitude of the Police

When the residents contact 100 for any emergency situation, residents say that Police do not respond well to the people and don’t make a visit to the spot. Hence people find it very difficult during the occurrence of unsafe incidents like theft, drug peddling etc.

CCTV

CCTV is not installed on the streets and this makes the streets very unsafe especially for women and children.

Drug

Drug culture is a big issue in Semmanchery. Children are getting addicted at very young age. Hence they neither go to study nor to work. This also leads to various other social problems like child marriage, giving birth to children at a very young age and so on.

5. HLL Tsunami Quarters Tondiarpet

Location: Tsunami Quarters, HLL Nagar, Tondiarpet

Geo Location : 13.135604540253299, 80.28892869357144

Location Link : https://maps.app.goo.gl/F3bmgtFLKAbRhiZv6

Garbage

Chennai corporation is treating the place like a private apartment complex and expecting the garbage to be dumped outside the premises. No door-to-door garbage collection is made available.

Sewage

Sewage block is frequent and not cleared for several weeks. This place is a breeding ground for mosquitoes and could potentially cause many health hazards to the residents. When a resident tried to call Chennai metrowater complaint number 044-4567 4567, the call center staff could not locate the address.

Ration Shop

People do not get supplies in ration shops most of the time.

Unavailability of drinking water

People end up buying drinking water as quality water is not available.

Unused recycling unit

We found the garbage recycling unit closed. Upon enquiring, we got to know that it was closed for several months.

6. TNUHDB Navalur Housing Audit Report

Oragadam Town, Kancheepuram District

Tenemental scheme name

Navalur

Town

Oragadam

District & Division

Kancheepuram

Panchayat

Serapanancheri

Municipality

Kundrathur

No of Tenements Constructed

2048

No of Tenements allocated

2029

Location

https://maps.app.goo.gl/pVG7NjLDsAv8uuZv6

Year of allotment

2016

No of floors in each block

4

It is learnt that the housing construction was completed in 2008 as police quarters, but police dept rejected it stating its location disadvantage. The settlement started post Chennai flood 2015, around 1000 families were relocated from area around Anna Nagar (MGR nagar, arumbakkam muthumariamman colony) (Chennai Central) and around 1000 families were relocated from area around Anna Nagar Tambaram, Mudichur, Urapakkam(Chennai South).

Water quality:

The drinking water is sourced from the well at the end housing board and supplied through tap setup at entrance of each block. Residents informed the quality of the water is not satisfactory and many of them depend on the can water sold in that area.

Tank water:

For every 2 houses, 500 litres water tank is setup over the terrace and water is sourced from the nearby Serapanancheri lake. There are total of 6 bore well (150-300ft depth) in the banks of the lake, from where the water is pumped to tank from sump storage. Residents informed the quality of the tank water which is causing itching sensation at times. There is a sewage treatment plant within the housing board, but resident doubt its capacity and efficiency due to which the sewage water is not properly treated and let into the Serapanancheri lake, from where the tank water is sourced.

Sewage

There is no proper treatment of sewage or drainage. The sewage is flowing nearby without any treatment into the lake.

Healthcare facility

Amma Clinic exists since 2016, but not functioning properly. No doctors available. Only a nurse come to distribute Sugar and BP tablets. Residents visit Salamangalam or Padappai government hospital which is 8-10 kms distance from here.

Crematorium

A manual crematorium is set in the bank of the Serapanancheri lake with no road access and residents informed that during heavy rains, the water from the lake submerges the crematorium.

Ambulance availability:

No Ambulance is stationed in the housing board area or in its surroundings. Ambulance had to come from Oragadam, which will take around an hour to reach this place during any emergency.

School:

There is a govt school for classes until 5th Std and only limited capacity until 8th Std. Construction of additional infrastructure is in progress. so, students are using other nearby buildings, hospital temporarily. Many students from 6th std are commuting to Govt schools in other nearby area.

Ration Shop:

Ration shop is available inside housing board premise. All rations are not available at same time, so residents have to take off duty from work place as different ration items are available in different days.

Theft:

Walajabad main road towards Panapakkam road is not lit and safety for residents, after sun set. Seems young guys under alcohol or drugs influence creates nuisance there.

Road:

Road not laid since the first settlement (2016). Residents are informed road will be re-laid sooner, but no progress.

Employment:

Employers from Orgadam, Sriperumpudur comes here for recruitment for their companies. They prefer candidates ages less than 40. So eligible candidate aged above 40 years are facing unemployment issue affecting their livelihood. Residents informed due to unemployment issue around 400 families have moved into city limits. Initially government had informed employment for all would be arranged in the Oragadam industrial corridor, but they feel betrayed.

7. Thideer Nager, Brickkiln Road, Otteri, Purasawalkam, Chennai

128, Brick Kiln Rd, THIDEER NAGAR, Purasaiwakkam, Chennai, Tamil Nadu 600007

Description:

The settlements of more than 500 families living in Thideer Nager, Brickkiln Road, Otteri, Purasawalkam, Chennai are in a very worrisome and unhealthy condition. All of the houses are extremely small (one room only) accommodating families of an average size of 4 members each, lacking basic hygiene and sanitation.

For over five decades, people say that multiple governments have come and gone, each making numerous promises, yet none have been fulfilled. Councilors often visit the area, offering assurances of permanent TNUHDB housing, but these promises seem to be made solely for votes. After the elections, there is nothing but silence and neglect. The residents are calling for permanent TNUHDB houses on land that will provide them with safe, sanitary living conditions and restore their dignity.

Building TNUHDB houses

The biggest demand of the residents of Thideer Nagar for many years is that TNUHDB houses be constructed for the 500 plus houses in the same place where they are living currently. There are huge vacant lands within where if there is political will, TNUHDB housing can be constructed for them immediately.

Lack of ventilation

The 500 houses are constructed so close to each other, almost sharing the wall leading to extreme congestion, leaving no room for cross ventilation. This situation is worse in summers due to the extreme heat in Chennai.

Lack of toilets

There are just 8 toilets, 4 each for gents and ladies respectively. About 2000 members are expected to defecate in these 8 toilets which are not maintained properly and stinking terribly. Therefore, people are forced to defecate in the open land (picture below), situated behind the settlements. Women are left to struggle all the more due to lack of privacy. Women are having to venture into the dark before dawn to empty their bowels. Women, especially young girls and pregnant women are the worst sufferers due to lack of healthy sanitation facilities.

Blocked storm water drains

There are multiple manholes throughout the pathway in the locality which we hear are storm water drains. More often than not, these drains are blocked pushing back water out of the drains. Since sewage water is also mixed in the drains, the leaked water causes heavy stink and also leads to unhealthy conditions, causing diseases to people there, especially small kids. Multiple complaints to the authorities seem to have yielded no results. The people in the locality say that they come and unclog the blocks, but the situation repeats itself in less than a week.

No drain for passage of grey water

There is no drainage provided for the grey water released from the houses to leave the area. Since there is no space, people wash their clothes or take bath in front of their houses but there is no pathway for the water to get drained. This once again causes mosquitoes to breed causing diseases to the people.

8. AIR Nagar, Tsunami quarters, Ennore

Date and time of Visit : 18.08.2024, 4 PM to 6 PM

Tenement scheme name & address Periya Kasi Koil Kuppam, Ennore, Tamil Nadu 600057
Location

https://maps.app.goo.gl/BfzuYaKLkjEsJHpr6

No of houses

159 Blocks, 5300 Houses

Garbage issues

The backyard of every flat is spilled on the wall and on the street, causing public health hazards. Adequate garbage bin and collection system should be arranged and continuous vigilance and monitoring is necessary.

Sewage Issues

At the back yard of each residence, the waste water pipe from the upper floor houses is broken and flows through the back wall. It causes bad smell and affects public health. It shows the poor quality of the pipelines used. As this situation prevails in many residences, the pipe used to drain the waste water from the upper floor houses should be replaced with good quality piplelines so that it does not break.

Urban Primary Health Centre

Status Inadequate Medical staff, improper timings.

Issues and Action required:

        1. From the above, it could be seen that residents in each of the above places have to live in pathetic conditions and the Government needs to take considerable effort to address the issues mentioned by the residents of the area above on a mission mode.

        2. There are many issues that could be seen commonly across different housing boards with respect to lack of basic amenities such as lack of running water, sewage, improper bus facilities, frequent power cuts, lift issues, unsafe power cables, garbage and so on.

        3. In particular, the quality of construction of these buildings are pathetic. It is clear that there is massive maladministration and corruption in the construction of these buildings in plastering, quality of pipes used and other materials. The Government must take serious efforts to repair these buildings and focus on quality of TNUHDB buildings.

        4. It is inhuman to not provide people living in multistoried buildings with running water. Places like Perumbakkam and other places get 1 hour water once in 2 to 3 days in their taps which they have to fill and use for the rest of the time. The Government must provide the minimum recommended per capita water for all these households everyday.

        5. Thousands of families have been relocated to areas such as Kannagi Nagar, Ezhil Nagar, Navalur, Semmenchery and others, which are far from their places of original residence and livelihood. The justification for this displacement is that they were encroaching / obstructing on water bodies. Ironically, many of these families have been moved to Marshlands, where poorly constructed housing by the Tamil Nadu Urban Habitat Development Board (TNUHDB) now stands. Not providing them with in-situ displacement has costed their livelihood dearly and has made their commute to work miserable. Commuting daily to the city through congested public transportation systems is both exhausting and financially draining. On average, 20% of their hard-earned income is spent on transportation. Despite the government providing free bus services for women, this is woefully inadequate. Government should drop such distant relocation of people and should strictly provide for insitu rehabilitation for people in the future. For people in these places, the Government should work on issues such as commute, livelihood and other issues to make their lives better.

        6. With no alternative jobs available in the distant locations, many youths are falling prey to anti-social activities and drug abuse, creating a vicious cycle of despair​ in Kannagi Nagar and Ezhilnagar, Perumbakkam, Semmenchery etc. Drugs, alcoholism in youth is a major concern that needs to be addressed.

        7. The Government must immediately plug the leakages in the maintenance contracts in TNUHDB and should ensure efficient governance in TNUHDB Buildings.

        8. The Government needs to immediately sanction and construct TNUHDB building in Thideer Nagar for its residents.

        9. There should be proper and transparent grievance redressal mechanism through phone and online for residents of TNUHDB. Currently, the response of the officials to the direct complaints of the residents are extremely poor. An accountable and trackable grievance redressal mechanism is the need of the hour.

        10. It requires serious behavioural and attitude change in the minds of the public servants of TNUHDB. Many in the department see these buildings as money making machines through construction and maintenance contracts rather than understanding that they are dealing with lives of people and the future of children living there. A strong political will and change in behaviour from the Government is important to make significant and meaningful changes to their lives. Lack of sufficient manpower within TNUHDB should also be addressed immediately.

Conclusion

Government must recognize that people in TNUHDB households are the backbone of the city and should work towards making their lives better. This study is an effort to make their lives better. The Government must take the issues mentioned by the residents in this study seriously and work on a mission mode to make significant and meaningful changes to their lives.

 

 

]]>
https://arappor.org/citizen-led-study-in-tnuhdb-buildings/feed/ 0
Govt land Grabbing - St. Thomas Mount https://arappor.org/govt-land-grabbing-st-thomas-mount/ https://arappor.org/govt-land-grabbing-st-thomas-mount/#comments Tue, 22 Oct 2024 03:43:41 +0000 https://arappor.org/?p=4769
Download Complaint and Annexure

அறப்போர் பத்திரிக்கை செய்தி

அமைச்சர் திரு ராஜகண்ணப்பன் தன் மகன்கள் மூலமாக ரூ 411 கோடி மதிப்புள்ள அரசு நிலம் அபகரிப்பு

அமைச்சர் திரு ராஜ கண்ணப்பன் அவர்கள் தன்னுடைய மகன்கள் மூலமாக ரூபாய் 411 கோடி மதிப்புள்ள கிட்டத்தட்ட ஐந்து ஏக்கர் சென்னை ஜிஎஸ்டி சாலையில் உள்ள அரசு நிலத்தை அபகரித்துள்ளதை குறித்தும் தன்னுடைய அதிகாரத்தை இன்று வரை துஷ்பிரயோகம் செய்து அந்த அரசு நிலத்தை தன்னுடைய குடும்பத்தின் கட்டுப்பாட்டில் வைத்துள்ளார் என்பதற்கான ஆதாரங்களையும் அறப்போர் இயக்கம் இன்றைய தினம் புகாராக லஞ்ச ஒழிப்பு துறை, முதல்வர் துணை முதல்வர் தலைமைச் செயலர் வருவாய் துறை அமைச்சர் மற்றும் வருவாய் துறை செயலர்களுக்கு அனுப்பியுள்ளோம். இந்த அரசு நிலம் உடனடியாக மீட்கப்பட்டு அமைச்சர் திரு ராஜ கண்ணப்பன் உட்பட இதில் சம்பந்தப்பட்ட அனைத்து பொது ஊழியர்கள் மீதும் FIR பதிவு செய்து உடனடியாக நடவடிக்கை எடுக்க கோரி உள்ளோம்.

இந்த அரசு நிலம் ஜிஎஸ்டி சாலையில் ஆலந்தூர் மெட்ரோவிற்கும் நங்கநல்லூர் மெட்ரோவிற்கு இடையே BSNL அலுவலகத்திற்கு அடுத்தபடி உள்ள பரங்கிமலை கிராமம் சர்வே எண் 1353 எண் 12, GST சாலை. இந்த நிலம் அரசு நிலம் தான் என்பதற்கான வருவாய்த்துறை பதிவேடு நகலை புகாருடன் இணைத்துள்ளோம். சர்வே எண் 1353 என்பது 4 ஏக்கர் 31,378 சதுர அடி கொண்டது மற்றும் சர்வே எண் 1352 என்பது 12964 சதுர அடி கொண்டது. இவை இரண்டும் புறம்போக்கு நிலங்கள் என்று வருவாய்த்துறை பதிவேட்டில் உள்ள ஆதாரங்களை புகாருடன் இணைத்துள்ளோம்.

முக்கியமாக 2015 இல் ஆலந்தூர் தாசில்தார் சென்னை தெற்கு இணை அலுவலகம் இரண்டு சார் பதிவாளர் அவர்களுக்கு எழுதிய கடிதத்தில் சர்வே எண் 1353, 1352 மற்றும் பல சர்வே எண்கள் அரசின் காலம் கடந்த குத்தகை நிலங்கள் என்றும் இந்த நிலங்கள் தற்பொழுது அரசு நிலங்கள் என்றும் இந்த சர்வே எண்களில் எந்தவிதமான பத்திரப்பதிவும் செய்யக்கூடாது என்றும் இதற்கு முன்பாக யாராவது செய்திருந்தால் அதை ரத்து செய்து தாசில்தாருக்கு அறிக்கை அனுப்பும் படி கேட்டுள்ளார். பரங்கிமலை கிராமத்தில் உள்ள பெரும்பாலான அரசு நிலங்கள் பிரிட்டிஷ் ஆட்சி செய்த பொழுது சிலருக்கு குத்தகை கொடுத்து பிறகு சுதந்திரம் அடைந்ததும் இந்த நிலங்கள் மீண்டும் அரசின் கட்டுப்பாட்டில் வந்தது.

டெக்கான் ஃபன் ஐலேண்ட் அண்ட் ஹோட்டல்ஸ் பிரைவேட் லிமிடெட் என்னும் நிறுவனத்தின் தற்போதைய இயக்குனர்களாக இருப்பவர்கள் அமைச்சர் திரு ராஜ கண்ணப்பனின் மகன்கள் பிரபு ,திவாகர் மற்றும் திலீப் குமார். மேலும் இவர்கள் மூவரும் தான் இந்த நிறுவனத்தின் தற்போதைய பங்குதாரர்களாகவும் உள்ளனர்.

சர்வே எண் 1353 மற்றும் சர்வே எண் 1352 நிலங்களை அபகரிப்பதற்காக இந்த நிறுவனம் 1991 முதல் 2018 வரை பல பத்திரபதிவுகளை செய்துள்ளது. 4.52 ஏக்கர் அளவிற்கு பத்திரபதிவு செய்ததற்கான ஆதாரங்களை புகார் உடன் இணைத்து இருக்கிறோம். 1990களில் காதியா பெயரில் இருந்த இந்த டெக்கான் ஃபன் ஐலேண்ட் அண்ட் ஹோட்டல்ஸ் லிமிடெட் ராஜ கண்ணப்பனின் மகன்கள் பெயருக்கு மாறுகிறது. கிட்டத்தட்ட 20 ஆண்டுகளாக அமைச்சர் ராஜ கண்ணப்பனின் மூன்று மகன்கள் தான் இந்த நிறுவனத்தின் இயக்குனர்கள் மற்றும் பங்குதாரர்கள்.

முக்கியமாக 2015-ல் ஆலந்தூர் தாசில்தார் இந்த சர்வே எண்ணில் எந்த பத்திரப்பதிவு செய்யக்கூடாது என்று தெரிவித்த பின்பும் மற்றும் இதற்கு முன்பாக பதிவு செய்தவற்றை ரத்து செய்ய வேண்டும் என்று சொன்ன பிறகும் அந்த பத்திரப்பதிவுகள் எதுவும் இன்றுவரை ரத்து செய்யவில்லை. இந்த கடிதத்திற்கு பிறகும் கூட 2018ல் இந்த நிலத்தை ஏழு லட்சத்திற்கு அடகில் இருந்து மீட்டது போல் டெக்கான் ஃபன் ஐலண்ட் அண்ட் ஹோட்டல்ஸ் லிமிடெட் பத்திரபதிவு செய்யப்பட்டுள்ளது. இந்த பத்திரப்பதிவின் பொழுது அமைச்சர் ராஜகன்னப்பனின் மகன்கள் தான் இந்த நிறுவனத்தின் பங்குதாரர்கள் மற்றும் இயக்குனர்கள்.

கடந்த ஆண்டு 1352 சர்வே எண்ணில் உள்ள 12984 சதுர அடி நிலம் மீட்கப்பட்டதாக அதன் வாசலில் வட்டாட்சியர் பல்லாவரம் பலகை வைத்துள்ளார். ஆனால் அதற்கு அருகிலேயே உள்ள கிட்டத்தட்ட 4.75 ஏக்கர் அளவிற்கு அமைச்சர் ராஜ கண்ணப்பனின் மகன்கள் கட்டுப்பாட்டில் உள்ள ஆக்கிரமிப்பு செய்யப்பட்டுள்ள சர்வே எண் 1353 அரசு நிலங்களை இன்று வரை மீட்கவில்லை.

அரசு வழிகாட்டி மதிப்பு படி பார்த்தால் இந்த நிலத்தின் தற்போதைய மதிப்பு 1 சதுரடிக்கு ரூ 11000 ஆகும். எனவே 205618 சதுரடி நிலத்தின் மதிப்பு ரூ 226 கோடி ஆகும். இந்த இடத்தில் சந்தை மதிப்பு குறைந்த பட்சம் 1 சதுரடிக்கு ரூ 20000 ஆகும். இதன் படி இன்றைய மதிப்பு ரூ 411 கோடி ஆகும்.

அமைச்சர் திரு ராஜ கண்ணப்பனின் அழுத்தத்தினால் வருவாய்த்துறை இந்த நிலத்தை மீட்காமல் உள்ளது என்று அறிகிறோம். அமைச்சர் திரு ராஜ கண்ணப்பன் தன் மகன்கள் பெயரில் நூற்றுக்கணக்கான கோடி ரூபாய் சொத்து சேர்ப்பதற்காக தன் அதிகாரத்தை துஷ்பிரயோகம் செய்து சொத்துக்களை சேர்த்து உள்ளார் என்று தெரிகிறது. இந்த நிலத்தை உடனடியாக அரசு மீட்க வேண்டும். அரசு நிலத்தை பத்திரப்பதிவு செய்வது சட்டவிரோதமாக இருந்தாலும் அதை தொடர்ந்து இந்த நிறுவனம் செய்து வந்துள்ளது. எனவே அமைச்சர் ராஜ கண்ணப்பன் அவரது மகன்கள் மற்றும் இதை மீட்டெடுக்காத வருவாய்த்துறை அதிகாரிகள் மற்றும் சட்டவிரோதமாக பத்திர பதிவு செய்த அதிகாரிகள் போன்றோர் மீது உடனடியாக FIR பதிவு செய்து விசாரிக்கும் படி அறப்போர் இயக்கம் கேட்டுக்கொள்கிறது.

Download Complaint and Annexure

]]>
https://arappor.org/govt-land-grabbing-st-thomas-mount/feed/ 1
Chennai Flood Audit 2024 by Makkal Medai https://arappor.org/chennai-flood-audit-2024-by-makkal-medai/ https://arappor.org/chennai-flood-audit-2024-by-makkal-medai/#respond Sat, 12 Oct 2024 14:35:08 +0000 https://arappor.org/?p=4734

Many citizens groups got together in mid-December, 2023 to brainstorm on what we as citizens need to do to prevent future floods. A network of local residents groups called `The Citizen’s Platform’ – Makkal Medai – had been formed in 2015 which worked for over a year and came out with a detailed concept note which pointed out that flood prevention in Chennai city and surrounding areas cannot be seen in isolation but has to be understood as being integrally linked with the nature and type of urban planning and infrastructure development, industrial growth, environmental protection and pollution control measures. People are slowly realizing that they are not just victims – but part of the problem itself. And that no solution can be found unless people are also involved in the solutions! It was therefore decided to revive the `Citizen’s Platform’ and once again resume the process of building a city-wide initiative bringing together concerned citizens, resident welfare associations, people’s representatives and officials.

]]>
https://arappor.org/chennai-flood-audit-2024-by-makkal-medai/feed/ 0
Wake Up DVAC - People's Campaign https://arappor.org/wake-up-dvac-peoples-campaign/ https://arappor.org/wake-up-dvac-peoples-campaign/#respond Wed, 25 Sep 2024 14:21:34 +0000 https://arappor.org/?p=4609

திமுக ஆட்சி அமைந்து 3 வருடங்களாக தூங்கிக் கொண்டு இருந்த லஞ்ச ஒழிப்புத்துறையின் தூக்கத்தை மக்களுடன் இணைந்து அறப்போர் இயக்கம் சற்றே கலைத்து விட்டுள்ளது. அறப்போர் இயக்கத்துடன் இணைந்து மக்கள் அனுப்பிய காபி பொடியும், நூற்றுக்கணக்கான ஈமெயில்கள் மூலம் அனுப்பிய கோரிக்கைகளும் அதன் வேலையை செய்ய துவங்கி விட்டன. லஞ்ச ஒழிப்புத்துறையின் மீதான இந்த அழுத்தத்தை நாம் நமது கேள்விகள் மூலம் தொடர்ந்து கொண்டே இருந்தால் ஊழல்வாதிகள் மீதான அவர்களது நடவடிக்கைகளை மேலும் அதிகரிக்க வைக்கலாம்.

லஞ்ச ஒழிப்புத்துறைக்கு எதிராக ஏன் இந்த பிரச்சாரம்?

இந்த தகவலை பார்த்தாலே ஏன் நாம் லஞ்ச ஒழிப்புத்துறைக்கு எதிராக குரல் கொடுப்பது அவசியம் என்பது உங்களுக்கு புரிந்து விடும். சென்னையில் லஞ்ச ஒழிப்புத்துறைக்கு 8 அலுவலகங்கள் செயல்படுகின்றன. 2021 முதல் அந்த 8 அலுவலகங்களின் செயல்பாட்டை நீங்களே பாருங்கள். வருடம் 27 FIRகள் துவங்கி அது குறைந்து கொண்டே வந்து கடைசியாக இந்த வருடத்தில் 8 மாதங்களில் வெறும் 4 FIRகள் மட்டுமே அவர்கள் பதிந்துள்ளார்கள். அதிலும் கடந்த 3 மாதங்களாக 1 FIR கூட பதிவு செய்யப்படவில்லை. அதாவது சும்மா உட்கார்ந்து தண்ட சம்பளம் வாங்கி இருக்கிறார்கள்.

அப்படி இவர்கள் என்ன சம்பளம் வாங்குகிறார்கள்?

தமிழகத்தில் செயல்படும் லஞ்ச ஒழிப்புத்துறை ஊழியர்களுக்கு சம்பளம் மட்டுமே வருடம் 54 கோடி செலவாகிறது. லஞ்ச ஒழிப்புத்துறை செயல்பட தமிழக அரசு வருடத்திற்கு 90 கோடி செலவு செய்கிறது. இவ்வளவு கோடிகளை விழுங்கி விட்டு தூங்கிக் கொண்டு இருந்தால் அவர்களை தட்டி எழுப்ப வேண்டியது நமது கடமை தானே. அதனால் தான் அவர்களை தட்டி எழுப்ப அறப்போர் இயக்கம் மக்களுடன் இணைந்து Wake Up DVAC என்ற Campaign செய்ய துவங்கியது. இதற்கு மக்களும் அமோக ஆதரவு கொடுத்தார்கள். இதை நீங்கள் அறப்போர் நடத்திய ஆன்லைன் poll மூலம் அறிந்து கொள்ளலாம்.

எந்த வேலையும் செய்யாத, மக்களுக்கு எந்த பயனும் இல்லாத, இழுத்து மூடப்பட வேண்டிய துறை எது என்ற கேள்விக்கு, வாக்களித்தவர்களில் 78% பேர் லஞ்ச ஒழிப்புத்துறை என்று குறிப்பிட்டுள்ளார்கள். ஆகவே மக்களை திரட்டி லஞ்ச ஒழிப்புத்துறைக்கு காபி பொடி அனுப்பி தூக்கத்தை கலைக்கலாம் என்று முடிவு செய்யப்பட்டது.

செப்டெம்பர் 15 அன்று மாலை மக்கள் ஒன்றுகூடி அறப்போர் அலுவலகத்தில் இருந்து DVACக்கு காபி பொடியுடன் அடங்கிய கோரிக்கை மனுவை அனுப்பி வைத்தார்கள். நேரில் வர முடியாதவர்கள்  https://arappor.org/send-email-to-dvac-wake-up-dvac/ இந்த இணைப்பை பயன்படுத்தி கோரிக்கை மனுவை ஈமெயில் மூலம் லஞ்ச ஒழிப்புத்துறைக்கு அனுப்பி வைத்தார்கள்.

நாம் அனுப்பிய காபி பொடியும் ஈமெயில் கோரிக்கையும் லஞ்ச ஒழிப்புத்துறைக்கு கிடைத்த 2 வது நாள் அறப்போர் கொடுத்த புகாரில் முன்னாள் அமைச்சர் வேலுமணி மீது FIR பதியப்படுகிறது.

அறப்போர் இயக்கத்தின் புகார் குறித்து விரிவாக அறிந்து கொள்ள https://youtu.be/EAiAqZXuhd8 இந்த காணொளியை பாருங்கள். இந்த காணொளியில் முன்னாள் அமைச்சர் வேலுமணியின் நெருங்கிய கட்சி பிரமுகர் மற்றும் contractor சந்திரசேகர் எப்படி எல்லாம் டெண்டர்களை செட்டிங் செய்தார் என்றும், டெண்டர் செட்டிங் செய்வதற்காக எப்படி ஒரே ip முகவரியில் இருந்து கணவன் மனைவி, மற்றும் அண்ணன் தம்பி ஆகியோர் போட்டி டெண்டர்களை அப்லோட் செய்தார்கள் என்பது குறித்தும் நீங்கள் தெரிந்து கொள்ளலாம். போடாமல் விடப்பட்ட மழை நீர் வாய்க்கால் அமைக்க டெண்டர் போடுவதாக சொல்லிவிட்டு ஏற்கனவே இருந்த மழைநீர் வாய்க்கால்களை உடைத்து விட்டு புதிய மழைநீர் வாய்க்கால் அமைத்து பணத்தை கொள்ளை அடித்துள்ளார்கள். இந்த புகாரில் வேலுமணி மற்றும் 10 மாநகராட்சி அதிகாரிகள் மீது FIR பதிவு செய்யப்பட்டுள்ளது. 3 வருடங்களாக இழுத்தடித்து பதிவு செய்த இந்த வழக்கில் விரைவாக விசாரணையை முடித்து 2 மாத காலத்தில் குற்றப்பத்திரிக்கை தாக்கல் செய்ய அறப்போர் இயக்கம் கேட்டுக் கொள்கிறது.

இந்த வழக்கை அடுத்து முன்னாள் அமைச்சர் வைத்திலிங்கம் மீது FIR போடப்படுகிறது. இந்த புகார் குறித்த முழு விவரங்களை அறிந்து கொள்ள https://youtu.be/BXkm-vjf6xU இந்த காணொளியை பாருங்கள்.

வீட்டுவசதித்துறை அமைச்சராக இருந்த சமயத்தில் கட்டிட அனுமதி கொடுக்க அதிமுக அமைச்சர் வைத்திலிங்கம் எவ்வாறு 27.9 கோடி லஞ்சம் பெற்றார் என்பது குறித்து தகுந்த ஆதாரங்களுடன் கொடுத்த அறப்போர் புகாரின் அடிப்படையில் இந்த வழக்கை லஞ்ச ஒழிப்புத்துறை தொடுத்துள்ளது. அடுத்த நாளே இந்த புகார் அடிப்படையில் அவர் வருமானத்திற்கு அதிகமாக சொத்து குவித்ததாக மற்றொரு வழக்கும் போடப்பட்டுள்ளது. கடந்த 3 மாதங்களில் zero FIR கணக்கில் இருந்த சென்னை லஞ்ச ஒழிப்புத்துறை அறப்போர் அழுத்தத்திற்கு பிறகு அறப்போர் கொடுத்த புகாரின் அடிப்படையில் வரிசையாக 3 FIRகளை போட்டுள்ளது.

அறப்போர் இது வரை கொடுத்துள்ள 30 ஊழல் புகார்களில் 3 புகார்களில் மட்டும் தான் FIR போடப்பட்டுள்ளது. மீதம் இருக்கும் புகார்களில் மிகவும் முக்கியமானது அதிமுக ஆட்சியில் நடந்த 2028 கோடி ரேஷன் கொள்முதல் ஊழல். இந்த ஊழல் குறித்து தெரிந்து கொள்ள https://youtu.be/IbJt7uADYsM இந்த காணொளியை பாருங்கள். அடுத்ததாக ஏழை மக்களுக்கு அதிமுக ஆட்சியில் புளியந்தோப்பு KP Park பகுதியில் கட்டி கொடுக்கப்பட்ட தரமற்ற வீடுகள் பற்றியது. இந்த புகார் பற்றி அறிந்து கொள்ள https://youtu.be/c7ct14h6yXU இந்த காணொளி பாருங்கள். இது போன்ற அறப்போர் கொடுத்த மேலும் பல புகார்களில் லஞ்ச ஒழிப்புத்துறையை நடவடிக்கை எடுக்க வைப்பது தான் இனி நமது வேலை.

முதல்வர் ஸ்டாலின் அவர்களின் கூண்டுக்கிளியாக செயல்படும் லஞ்ச ஒழிப்புத்துறையை மக்களுக்காகவும், ஊழல்வாதிகளுக்கு எதிராகவும் செயல்பட வைக்க வேண்டியது நமது வேலை.

அறப்போர் இயக்கத்துடன் இணைந்து செயல்பட உங்களையும் அழைக்கிறோம். இது வரை ஈமெயில் மூலம் லஞ்ச ஒழிப்புத்துறைக்கு கோரிக்கை வைக்காதவர்கள் இந்த இணைப்பின் https://arappor.org/send-email-to-dvac-wake-up-dvac/ மூலம் இன்றே உங்கள் பங்களிப்பை செய்து விடுங்கள். கீழே கொடுக்கப்பட்டுள்ள அறப்போர் நன்கொடை இணைப்பை பயன்படுத்தி இயக்க பயணிகளை ஆதரிக்க உங்களால் இயன்ற நன்கொடை அளியுங்கள். மாதா மாதம் ஒரு குறிப்பிட்ட தொகை நன்கொடை அளித்து இயக்க பணிகளை ஆதரிக்க உங்கள் விவரங்களை பதிவு செய்யுங்கள். அறப்போர் இயக்கத்தின் பணிகளின் தொகுப்பை தொடர்ந்து உங்கள் ஈமெயில் மூலம் பெற்றுக்கொள்ள இன்றே Subscribe செய்யுங்கள்.

]]>
https://arappor.org/wake-up-dvac-peoples-campaign/feed/ 0
Send Email to DVAC - WakeUp DVAC https://arappor.org/send-email-to-dvac-wake-up-dvac/ https://arappor.org/send-email-to-dvac-wake-up-dvac/#comments Sun, 15 Sep 2024 17:29:07 +0000 https://arappor.org/?p=4436 Read more

]]>

Wake Up DVAC and file cases against Corruption and Bribery

To send Email to DVAC, Click the button below

It is very concerning to learn that the performance of the Directorate of Vigilance and Anti-Corruption has dropped drastically over the last 3 years. While DVAC had been filing around 281 regular case FIRs in 2019 in Tamil Nadu, the numbers have dropped drastically to around 130 to 140 in the years 2022 and 2023 and to 72 in the current year thus far. More importantly, the Chennai units of DVAC have filed only 4 regular cases in the current year while it was filing around 55 regular FIRs in the year 2019. More importantly, it is shocking to learn that the 8 Chennai units of DVAC together have not even filed a single FIR from June 2024 till date. 

I would like to remind you that DVAC’s annual budget is around Rs. 80 to 90 Crores and around Rs. 55 Crores out of this is spent on salaries alone. Our tax money seems to be going down the drain. Bribery and Corruption has been the order of the day in many Government Departments of Tamil Nadu and the general public is put to an huge ordeal to access Government services and schemes. The common public is dependent on DVAC for action against the Corrupt. However, the abysmal performance of DVAC does not lend any confidence. Years of delay in enquiry by DVAC on corruption complaints, years of delay by the Government in awarding permission to DVAC to even file an FIR for carrying out investigation only reminds us of the maxim ‘Justice delayed is Justice denied’. Such delay and withholding of permissions seems to be a direct effort by the Tamil Nadu Government and DVAC to save the Corrupt involved in swindling of crores of taxpayer’s money.

Therefore, I am sending this petition for you to wake up, act and get DVAC to file FIRs against Bribery and Corruption in Tamil Nadu. We expect a strong reply from you through your actions of filing FIRs and carrying out prosecution against the Corrupt.

]]>
https://arappor.org/send-email-to-dvac-wake-up-dvac/feed/ 12
MK Stalin Supporting the Corrupt by Delaying the Investigation https://arappor.org/mk-stalin-supporting-the-corrupt-by-delaying-the-investigation/ https://arappor.org/mk-stalin-supporting-the-corrupt-by-delaying-the-investigation/#respond Wed, 11 Sep 2024 15:10:44 +0000 https://arappor.org/?p=4293 அறப்போர் கொடுத்த 30 புகாரில் பெரும்பாலும் லஞ்ச ஒழிப்பு துறையில் தான் உள்ளது அல்லது FIR/ விசாரணை முன் அனுமதிக்காக தமிழ்நாடு அரசிடம் உள்ளது. அறப்போர் புகாரில் நமக்கு தெரிந்து கே.சி.வீரமணி மீதான குற்றப்பத்திரிகைக்கான அனுமதி மட்டுமே கவர்னர் ரவி அவர்களிடம் தூங்கி கொண்டு உள்ளது. அதிகாரிகளுக்கு அனுமதி தர வேண்டியது மாநில அரசு தான். தற்போதைய MLA க்களுக்கு அனுமதி தருவது மாநில அரசு தான். அமைச்சராக இருந்தால் மட்டும் தான் அது கவர்னருக்கு செல்லும்.

கே பி பார்க் ஊழல், ஸ்மார்ட் சிட்டி ஊழல், தனியாரிடம் மின்சாரம் வாங்கியதில் ஊழல், பஸ் ஷெல்டர் ஊழல், நெடுஞ்சாலை ஊழல் என பல ஊழல்களில் FIR போடாமல் தடுத்து நிறுத்துவது முதல்வர் ஸ்டாலின் அவர்களின் அரசே! கிறிஸ்டி ரேஷன் ஊழல் , அதானி நிலக்கரி ஊழல், கல் குவாரி ஊழல், அண்ணா பல்கலைக்கழக ஊழல் என பல ஊழல்களில் FIR போட அனுமதி கூட கேட்காமல் விசாரணையை மாத வருட கணக்கில் இழுத்தடிப்பது லஞ்ச ஒழிப்பு துறை!

சென்னை கோவை மாநகராட்சி ஊழல் மீதான குற்றப்பத்திரிக்கை தாக்கல் செய்ய லஞ்ச ஒழிப்பு துறை மீது அறப்போர் நீதிமன்ற அவமதிப்பு வழக்கு தொடுத்து நீதிமன்றம் 2 வாரங்களுக்குள் செய்ய சொன்ன பிறகும், இது நடந்து 4 மாதங்கள் ஆகியும் இன்று வரை குற்றப்பத்திரிக்கை தாக்கல் செய்து முடிக்கப்படவில்லை.

எனவே பெரும்பாலான புகார்களை FIR போடாமல் மூடி மறைக்க வேலை செய்யும் லஞ்ச ஒழிப்பு துறையையும் முதல்வர் ஸ்டாலின் தலைமையிலான தமிழ்நாடு அரசையும் வலுவாக கேள்வி கேட்க வேண்டிய நேரம் இது ! ஊழலுடன் சமரசம் செய்யும் லஞ்ச ஒழிப்பு துறையை தூக்கத்தில் இருந்து எழுப்புவோம் ! வருகிற ஞாயிறு மாலை 5 மணிக்கு அறப்போர் அலுவலகத்தில் சந்திப்போம்.

முகவரி – 7, 2nd Floor, Dr Thirumoorthy Nagar Main Rd, Nungambakkam, Chennai.

Arappor Office Location – maps.app.goo.gl/vAExrimU4jy5sQ

#WakeupDVAC

 

]]>
https://arappor.org/mk-stalin-supporting-the-corrupt-by-delaying-the-investigation/feed/ 0
Wake Up DVAC - Campaign Meeting https://arappor.org/wake-up-dvac-campaign-meeting/ https://arappor.org/wake-up-dvac-campaign-meeting/#respond Tue, 10 Sep 2024 16:56:14 +0000 https://arappor.org/?p=4288 லஞ்ச ஒழிப்புத்துறையின் தூக்கத்தை கலைப்பது எப்படி?

சென்னையில் மட்டும் லஞ்ச ஒழிப்புத்துறையின் 8 பிரிவுகள் செயல்படுகின்றன. அவர்கள் இணைந்து திமுக ஆட்சியில் மொத்தமாக பதிவு செய்த FIRகள் 75 மட்டுமே. அதிலும் 2024ம் வருடத்தில் கடந்த 8 மாதங்களில் வெறும் 4 FIRகள் மட்டுமே பதிவு செய்யப்பட்டுள்ளன. கடந்த 1.5 வருடங்களாக லஞ்ச ஒழிப்புத்துறை இயக்குனராக பதவி வகிக்கும் Abhay Kumar Singh IPS காலத்தில் DVAC தூக்கத்தில் இருக்கிறதா அல்லது போதையில் இருக்கிறதா என்று தெரியாத மோசமான நிலையில் இருக்கிறது.

அறப்போர் கொடுத்துள்ள KP Park ஊழல் புகார் மற்றும் Smart City ஊழல் புகார்களை விசாரிக்க லஞ்ச ஒழிப்புத்துறைக்கு அனுமதி கொடுக்காமல் அதற்கு பதிலாக முதல்வர் ஸ்டாலின் தூக்க மாத்திரை கொடுத்து தூங்க வைத்துள்ளார். ஒவ்வொரு வருடமும் கோடிக்கணக்கான மக்கள் பணத்தை விழுங்கி செயல்படும் லஞ்ச ஒழிப்புத்துறை இப்படி தூங்கிக் கொண்டு இருப்பதால் ஊழல்வாதிகள் மகிழ்ச்சியாக இருக்கிறார்கள். இவர்களின் தூக்கத்தை நாம் தான் கலைக்க வேண்டும். வருகிற ஞாயிறு மாலை 5 மணிக்கு அறப்போர் அலுவலகத்தில் இருந்து லஞ்ச ஒழிப்புத்துறைக்கு காப்பி பொடி அனுப்பி அவர்கள் தூக்கத்தை கலைக்க முயற்சி செய்ய இருக்கிறோம். நீங்களும் காப்பி பொடியுடன் வந்தால் நமது அலுவலகத்தில் இருந்து அனுப்பி வைக்கலாம். #WakeUpDVAC

Meeting Date – Sunday 15 Sep 2024, Time – 5 PM

Arappor Office Location – maps.app.goo.gl/vAExrimU4jy5sQ

]]>
https://arappor.org/wake-up-dvac-campaign-meeting/feed/ 0